16 January 2024 |
- Follow up actions from the 2023 ion run (R. Bruce)
- News on 10 Hz events (J. Wenninger)
- Analysis of the performance during the ion run (N. Triantafyllou)
|
13 February 2024 |
- tatus of the ML tool for longitudinal injection data (K. Iliakis)
- Beam commissioning 2024
|
27 February 2024 |
- Partial RP optics for 2024 (S. Fartoukh)
- Collimation settings and commissioning in 2024 (F. Van Der Veken)
|
5 March 2024 |
- News on 13L8 (J. Wenninger)
- Scrubbing plans and 2024 filling scheme options (L. Mether)
- Bunch Length observations in 2023 Operation (J. Wenninger)
- Beam induced heating of warm vacuum modules for operational beams and MDs (C. Zannini)
|
19 March 2024 |
- Results of 13L8 vibration tests (M. Guinchard)
- Octupole settings in 2024 for different configurations (X. Buffat)
- Discussion 93cm - 120 cm
|
26 March 2024 |
- Bunch length control in the cycle (H. Timko)
- Proposal for the 2024 wires-compensation knobs (G. Sterbini)
|
23 April 2024 |
- Summary of the 2024 scrubbing run (K. Paraschou)
- Observations on collimator hierarchy breakage below 36 cm (D. Mirarchi)
|
7 Mai 2024 |
- Summary of observations on hierarchy breaking (J. Wenninger)
- Optics measurements 120cm - 30cm (T. Persson)
- Beam loss pattern analysis (S. Morales)
- Diamond BLM and collimator BPM analysis for the 30 cm hierarchy breaking (B. Lindstrom)
|
4 June 2024 |
- Impact of phase-space distortions on the collimator hierarchy (K. Paraschou)
- Latest results on hierarchy breaking at 30 cm (D. Mirarchi)
- Tail measurements from the SPS to the LHC (S. Kostoglou)
- Comparison BCMS - standard beam (S. Kostoglou)
|
25 June 2024 |
- Plans and status of preparation for the 2024 Pb ion run (R. Bruce)
- Plans and status of preparation for the 2024 pp reference run (R. Alemany)
|
27 August 2024 |
- Injection losses in Run 3 and expectations for HL (Y. Dutheil)
- Update on pp reference run configuration (R. Alemany)
- Orbit control improvements for ramps and squeezes (J. Wenninger)
|
10 September 2024 |
- Debunching during flat bottom in 2024 (B. Karlsen-Baeck)
- LHC performance with BCMS beams (S. Kostoglu)
|
24 September 2024 |
- Update on filling scheme and bunch intensity ranges (for 2025) (L. Mether)
- Results from the BGC in 2024 (D. Butti)
|
15 October 2024 |
- LHC Controlled Emittance Blow-up in 2024 (N. Gallou)
- Ion configuration and commissioning plan (R. Bruce)
- LHC configuration options for 2025/2026 (M Solfaroli)
|
22 October 2024 |
- Chromaticity measurements with the LHC Shottky monitor (K. Lasocha)
- Orbit control improvements for ramps and squeezes (J. Wenninger)
|
5 November 2024 |
- Summary of D1 higher current powering test (M. Solfaroli)
- Impact of increased b3 in D1 on NL optics corrections (E. MacLean)
- Impact of e-cloud in the triplet with rotated crossing angle plane and flat optic (K. Paraschou)
|