Minutes/Date

Topics presented

Presence sheet
21 January 2014
  • Summary of mini-review (9/12/2013) of MKI upgrades during LS1 (M.J. Barnes)
  • LSA settings cleaning and new API (J. Wenninger)
  • OP organization for the 'Dry' commissioning (J. Wenninger)
List
28 January 2014
  • Update on emittance analysis (M. Kuhn)
  • Lifetimes in Stable Beams revisited (M. Lamont)
  • Preparation for restart: work and topics outline (G. Arduini and J. Wenninger)
List
11 February 2014
  • LHC UPS System and Configurations: Changes During the LS1 (V. Chareyre)
  • Orbit Correction: References, functions and more (J. Wennninger)
List
25 February 2014
  • Report on second TN disconnection test of January 28th 2014 (A. Bland)
  • LHC collimation system for the startup in 2015 (B. Salvachua Ferrando)
  • Update estimates of collimator settings and beta* for the startup after LS1 (R. Bruce)
List
11 March 2014
  • Transverse instability observation triggering network (D. Valuch, T. Wlostowski)
  • Transverse instability observation (D. Valuch)
List
25 March 2014
  • Electron cloud vacuum instrumentation and solenoids (V. Baglin)
  • Dedicated injection from the SPS and transfer line powering (V. Kain)
  • Recommendations from collective effects considerations for the LHC 2015 run (E. Mètral)
List
  8 April 2014
  • Injector beam requirements and options (G. Rumolo)
  • Beta* leveling scenarios and implementation (A. Gorzawski)
List
  15 April 2014
  • IR4 changes of optics: implications on beam size measurements (G. Trad)
  • PU choices for ADT: Plans for Run 2 (W. Hoefle)
  • Optics for the 2015 Pb-Pb run (J. Jowett)
List
  29 April 2014
  • Optics options after LS1 (S. Fartoukh)
List
  6 May 2014
  • Beam induced heat load on LHC cryogenic; tools for operation (S. Popescu)
  • Estimates for Beta-beating at 6.5-7 TeV (A.S. Langner)
List
  27 May 2014
  • Recommendation for beam-beam separation (T. Pieloni)
  • Preliminary list of beam measurements during commissioning (S. Redaelli)
List
 8 July 2014
  • Cycles and pre-cycles definitions for 2015 (E. Todesco)
List
  15 July 2014
  • ADT re-commissioning after LS1 (D. Valuch)
  • Injection System Commissioning: Tests and Beam-(Time) Requirements (W. Bartmann)
List
 29 July 2014
  • LHC RF re-commissioning for run 2 (P. Baudrenghien)
  • Emittance measurements setting-up and cross calibrations (F. Roncarolo)
List
 26 August 2014
  • Optics measurements and corrections for commissioning (R. Tomas Garcia)
  • Aperture measurement plan (S. Redaelli)
List
 9 September 2014
  • Commissioning requirements for trajectory, orbit and tune measurements (T. Lefevre)
  • Wrap up of LMC optics and beta* (J. Wenninger)
List
 21 October 2014
  • Transfer Line tests planning (V. Kain)
  • Status of the fault tracking tools (C. Roderick)
List
 28 October 2014
  • Analysis of the LHC injection tunes during Run1 (R. De Maria)
  • Heat load analysis for inner triplet and stand alone modules (G. Iadarola)
List
 25 November 2014
  • Beam offset control during beta* leveling (A. Gorzawski)
  • TL test summary (V. Kain)
  • Automated & fast BPM & COD quality check (J. Wenninger)
  • Overcoming 60A orbit corrector trips (J. Wenninger)
List
 9 December 2014
  • Beam observation with the ATLAS BCM (M. Huhtinen)
  • Analysis of the TL test results (W. Bartmann)
  • Kicker waveform, SPS and transfer lines stability (L. Drosdal)
List
 16 December 2014
  • Beam observation with ALFA (S. Jakobsen)
  • First results from BPM response with doublet beams (T. Lefevre)
List